Next up
Today, we perform the lighting test in the corridor.
We completed the ninth loop and are working to finalize bathroom modeling.
Hey guys,
We have finalized some more models of the bathroom, not yet finalized, but has already implemented the reflection of the bathroom in the mirror, and the reflection of light in the mirror.
Performing material illumination correction. That was the result.
It is not stopped !!!
We are just organizing the improvement of mood lighting, to make it look as similar as possible.
We already have interactions with the first 5 'levels', and corrected the room transition continuously.
Short intro of us 💕✌️
We're an eletro duo based in Seoul 🇰🇷 Heavily influenced by the 90s.
Our new album #Xennials is all about the nostalgia of that era 💽 CD listenin 📟 beeper beepin 💾 floppy disks floppin days 😎
Stream now! 🎧
https://open.spotify.com/album/3YwWhnHWVy5cA8XOpbaGRA?si=8E9awqU…
What do you think guys in my robot?Just a beginner in 3d modeling..
My instagram https://www.instagram.com/rojhonbb/
Family band complete!
Finished work on the emotions of a new character for the tank universe
A house I've built a while ago. :)
It nicely separates the snowy biome from the grassy one.
It's built with painted Ebonstone.
I worked so hard to get all four of them to the end safely, but then...












0 comments