Game
Universal Dream


1 day ago

There is something in the dark , but to dark to see , unless you fall asleep , [ Office in maintenance ]


INCIDENT & OBSERVATION REPORT - MAIN CONSTRUCTION SITE
Company: Atlas Build Maroc (ABM)
Project: Construction of Headquarters, "Les Jardins de l'Atlas" Subdivision, Sector 7
Reference: RPT-ABM-044-2023
Prepared by: Karim El Amrani, Site Foreman
Date: October 26, 2023
Recipients: General Management, Safety Committee, Central Archives


1. REPORT OBJECTIVE
To document a series of abnormal events occurring at the headquarters construction site over the past six weeks, impacting scheduling, crew morale, and overall safety. These incidents fall outside the scope of usual technical malfunctions.

2. CONTEXT & SUMMARY CHRONOLOGY
Work progressed according to schedule until early September. Initial events were reported in isolation before multiplying and intensifying.

3. DESCRIPTION OF ABNORMAL EVENTS

  • 3.1. Structural "Self-Sealing" Phenomena:

    • Several openings (interior doors, passages for technical conduits) close or become obstructed by themselves overnight, with no logical explanation. The masonry remains intact, as if the space had "decided" to close. The most glaring case involves the East access corridor (level -1), sealed three consecutive times despite being opened daily.

  • 3.2. Targeted Memory Loss & "Forgotten" Zones:

    • At least seven experienced workers reported having "forgotten" the complete layout of specific sections of the building (notably the North wing, ground floor) after a night's rest. These areas must be rediscovered and re-measured each time, causing significant delays.

    • The foreman, Mr. Rafik, stated: "We put up partitions, we mark the locations. The next day, everything is there, but in our heads... it's like a blank. As if that part of the plan never existed for us."

  • 3.3. Temporal and Sensory Anomalies:

    • Concordant reports mention "gaps" in the day, where workers lose their sense of time (loss of 1 to 3 hours without realizing it), often on the upper floors or in the basements.

    • Recurrent sounds of whispers or scratching within walls, localized and impossible to trace.

    • A feeling of an "observing presence" unanimously reported in the main hall after 6:00 PM.

4. NOTABLE INCIDENTS & TESTIMONIES

  • Incident #12: On 10/12, the finishing crew refused to work in the 2nd-floor bathrooms, citing an "oppressive atmospheric pressure" and the persistent feeling of being touched by invisible hands.

  • Incident #15: During their follow-up visit on 10/20, the main client, Mr. Enzo Bianchi, and his partner, Ms. Eline, insisted on inspecting the basements alone. Upon their return, Mr. Bianchi was extremely pale and requested access to the initial land surveys, murmuring repeatedly: "There is something in the dark, but too dark to see, unless you fall asleep." Ms. Eline, for her part, categorically refused to go back down, without further comment.

  • Incident #17: Three workers decided to spend the night on site to "solve the mystery." They left before dawn, without collecting their belongings, and have since refused to set foot on the site again.

5. IMPACT

  • Delays: Accumulated 3-week delay on the critical path.

  • Human Resources: 40% turnover in finishing crews. General decline in morale and rising tensions.

  • Safety: Increased risk of accidents due to distraction or panic.

6. PROVISIONAL RECOMMENDATIONS

  1. Immediate suspension of night work.

  2. Organization of a joint visit with a surveyor-expert and the design office to verify any anomalies in the foundations and blueprints.

  3. Discrete consultation regarding the history of the land (local archives).

  4. Reinforcement of temporary lighting, particularly in areas identified as "problematic."

7. CONCLUSION
The events described above do not fall under any crisis protocol known to management. They present a systematic and psychologically destabilizing character that threatens the integrity of the project. A thorough and confidential investigation is imperative before any resumption of normal activities.

Signature,

Karim El Amrani
Head Site Foreman
Atlas Build Maroc


Marginal note (handwritten): "Attach Appendix A: Photos of 'self-sealed' masonry. Appendix B: Drawings found in the site hut (repetitive patterns). P.S.: The workers are now speaking of 'El Ghoul' in the foundations. I don't know what to think anymore."

drawing_1.jpg


0 comments

Loading...

Next up

coming for that booty

I don't hate you, but you need to stay out of my way.

Devlog #2: Box of old things

(READ ARTICLE)

(Follow game: https://gamejolt.com/games/inthecrawlspace/898988)

Runestones: from concept to in-game model🗿

I was bored, so... ManutKat.

Family band complete!

Horror WIP A track that will be featured in a future horror game soundtrack! Stay tuned!

Likes appreciated ✌️

#gamedev #composer #horrorgame #indiegame #IndieGameDev #soundtrack

Update 2.627

New challenges & new effects!

Terraria