views
57
likes
0

Comments

What do you think?
No comments yet.
Free

OVERCRASH (Alpha Demo)

Version: 26.1.28about 2 months ago
Windows build, tested on Linux using Wine/Proton.

Available for Windows and tested on Linux using Wine/Proton.

About the Game

Traffic Jam Challenge:

Smash streetlights, billboards, barrels, and barricades. Every hit drives your points higher.

Link crashes, explosions, and takedowns into one relentless streak.

1.gif

Watch as sparks fly, fire spreads, and smoke raise.

2.gif

The faster you go, the harder you hit.

4.gif

Rush Hour Challenge:

Pass through all checkpoints before the timer runs out, each checkpoint gives you more time.

But watch out the traffic, they don't know how to drive and want revenge for what you did in the traffic jam challenge.

3.gif

New rides:

Each challenge completed give you stars to unlock new challenges and vehicles that changes how you drive. Heavier, faster, or a fuel barrel on wheels.

5.gif

Objectives of this Alpha Demo

This is an alpha demo with the goal of gathering feedback to improve the game until this year's second Steam Next Fest, when the ā€œfinalā€ version of the demo will be released.​

The game's release date and whether or not it will be released in early access will depend on the feedback.​

If you liked the game and want to help, you can:

  • Wishlist theĀ gameĀ on Steam

  • Give feedback inĀ theĀ surveyĀ or here in the comments

  • Report bugs inĀ theĀ surveyĀ or here in the comments

  • Report translation errorsĀ (current version made using DeepL and Google translator) inĀ theĀ surveyĀ orĀ here in the comments

  • Share the game with others that may like the game

  • Share the game on your social media

  • Record gameplay of the game

Steam link:Ā https://store.steampowered.com/app/3980070/OVERCRASH/

Survey link:Ā https://forms.gle/jupfASeGuYt9CbNm7

If you are a developer, there are some open-source plugins available that were used in the project on GitHub​:Ā https://github.com/CreatoramaStudio

#racing #arcade #action #combos #destruction #driving #physics #scoreattack #timeattack #simulation #vehicles #sports



all-ages
Cartoon Violence
Nothing has been posted to this project page yet. Check back later!